Roadwork Information
For any questions regarding the different works, you can contact us at 450 621-3500, ext. 3314.
NOTICE OF TRAFFIC DISRUPTIONS
mAY 19 TO JULY 7
mAY 19 TO JULY 7
From May 19 to July 7, construction work will cause traffic disruptions, including street closures and local traffic only, at the following locations:
- Des Prés Street (between Des Prés Street and Lombard Street)
- Lombard Street
- Poplar Street (between Northcote Street and Roland-Durand Street)
- Des Cerisiers Street
For everyone’s safety, please follow the posted signs.
It is the responsibility of road users and affected parties to plan and adjust their travel accordingly.
flushing the water supply system
Starting April 21 and during the next 7 weeks, Rosemère will be carrying out the progressive flushing of its waterworks system, throughout the entire territory. This will be done weekdays between 7:30 a.m. and 7 p.m.
Flushing the waterworks system is necessary to maintain good water quality. We regret any inconvenience arising from this operation and thank you for your collaboration.
Operating sequence by sector:
- Sector 1: done
- Sector 2: ongoing
- Sector 3: to come
- Sector 4: to come
- Sector 5: to come.
WORK ON HIGHWAY 15 BETWEEN HIGHWAY 640 AND 50
The Ministère des Transports et de la Mobilité durable wishes to inform road users that work to build a new left-hand lane on Highway 15 between Highway 640 and 50 will begin on June 6, 2023, and will be spread over a three-year period. This new lane will be reserved for public transit, carpooling and emergency services.
Due to the nature of the work, complete and partial closures of Highway 15 northbound will be necessary throughout the construction period.